Red Mountain

Thirty thousand square feet, taken back to studs.

The project

The entire house was taken back to studs in anticipation of the remodel, which meant we could rebuild the lighting and network from scratch rather than working around what was already there. At thirty thousand square feet, that is a considerable amount of infrastructure to plan before a single wall closes.

Lighting runs on a Control4 adaptive phase system supporting 250 loads. Adaptive phase matters at this scale because a house this size inevitably ends up with a mix of LED driver types, and adaptive dimming holds a smooth curve at the bottom of the range where cheaper systems step and flicker. Control wire was run throughout the property to service keypads in every space.

Window treatments and smart shades were customised for every window in the house, and we created three exterior audio zones alongside the interior system.

The centrepiece is the theater — the first 8K movie theater in Aspen, projecting onto a 200-inch acoustically transparent screen. Acoustic transparency is what allows the left, centre and right channels to sit behind the screen rather than beside it, so dialogue and effects come from the centre of the action instead of from the edges of the room. It is the single detail that separates a genuine cinema from a large television.

At a glance

Location
Red Mountain, Aspen
Type
Major remodel — AV, network and window treatments
Year
2023
Property
30,000 sq ft, taken back to studs
Lighting
Control4 adaptive phase, 250 loads
Theater
First 8K theater in Aspen
Screen
200-inch acoustically transparent
Audio
LCR behind screen, 3 exterior zones
Shading
Custom treatments, every window
Press
Featured in Reader's Digest

Gallery

On site.

Photographs taken during installation and at handover. Select any image to view it larger.

Projection onto the 200-inch acoustically transparent screen
Projection onto the 200-inch acoustically transparent screen
Custom engraved keypad, set into stone
Custom engraved keypad, set into stone
Control4 adaptive phase dimming modules and load terminations
Control4 adaptive phase dimming modules and load terminations
Lighting panel — part of the 250-load installation
Lighting panel — part of the 250-load installation
Equipment rack build during first fix
Equipment rack build during first fix
The theater during construction, before acoustic treatment
The theater during construction, before acoustic treatment
Games room with distributed audio and video
Games room with distributed audio and video
Room shell taken back to studs before rebuild
Room shell taken back to studs before rebuild

Next project

Willits

A ground-up build where we were invited in as the only technology contractor — network, lighting, audio, shading, security and access, designed as one system from the start.

View project

Considering something similar?

Tell us about the property and we will tell you honestly what it would take.